ContentSproute

Network Rail launches £240m OLE steelworks framework race thumbnail

Network Rail launches £240m OLE steelworks framework race

The deal will cover steel piles, structures, small parts and fixings for electrification schemes, with the framework running for six years and the option of a two-year extension.

Up to 25 suppliers will be appointed across five lots, with tenders due by 22 September. The largest packages are £99m for steel structures and £70m for steel piles.

Bidders for the first two lots will need to demonstrate they can buy and store steel on behalf of Network Rail, with a vesting certificate in place.

Shortlisted firms will be invited to e-auctions for most lots early next year, with awards expected by the end of January 2026.

Framework breakdown

Lot Description Value £m)
1 Steel piles – tubular piles used for foundations 70
2 Steel structures – masts and spans  for OHLE 99
3 Small part steel – uncontrolled components to attach OHLE equipment to structures 27
4 Small part steel – controlled clips and clamps to secure items and support OHL wire 31
5 Fixings – electrification-specific fixings and fasteners for securing structures 13

For more details click here.

Read More

Scroll to Top